Client: Rio Tinto Iron Ore
Location: Cape Lambert
Project Duration: December 2014 – September 2015
Service Type: Construction Project
SCOPE OF WORK
Supply and Installation of replacement 200NB steel waterline including fittings and fixtures along RTIO Cape Lambert stockyard row zero to supply dust suppression water cannons. Works included decommissioning and removal of existing redundant row zero waterline.
PROJECT HIGHLIGHTS
- Installation of 943m of pipeline adjacent to a highly trafficable road.
- Full surveying of pipeline route including pipe support locations.
- Civil works including installation of support foundations.
- Fabrication and installation of pipe supports.
- Pipeline installed above ground to allow for visual inspection and maintenance.
- Pipeline sections were install below ground to allow machine access to the stockyard at specific locations.