Client: Shell Bitumen
Location: Birkenhead S.A.
Project Duration: June 2009 – November 2009
Service Type: Air Pollution Control – Odour Control
SCOPE OF WORK
- Engineering, design, supply, manufacture, delivery and commissioning of one (1) Regenerative Thermal Oxidiser system including fans, discharge stacks, support structure, ducting, dampers, drain pot, gas supply lines, gas train and flame arrester.
- Installation works including civil, electrical and mechanical.
PROJECT HIGHLIGHTS
- Three bed RTO design capacity 3000 m³/h.
- 316 stainless steel used to fabricate all duct work.
- Gas train fully certified Type “B” appliance.
- Gas pipeline designed to be suitable for installation within a Hazardous Area Zone 2.