Client: CSBP
Location: Kwinana
Project Duration: October 2010 – February 2012
Service Type: Air Pollution Control – Odour Control
SCOPE OF WORK
- Detailed engineering design, manufacture, supply, delivery to site, installation and commissioning of a Regenerative Thermal Oxidiser (RTO) system.
- Detailed design, supply and installation of a pre-cleaning system.
- Scope encompassed all civil, structural, process, mechanical and integral electrical/instrument (E/I) cabling works for the project required to achieve a complete and operational installation.
PROJECT HIGHLIGHTS
- Volatile Organic Compounds (VOC) destruction efficiency of 98%.
- Fan and 37m high stack fabricated from 316 stainless steel.
- FRP ductwork and equipment casing used due to the nature of the gasses being treated.
- Thermal imaging technology used during commissioning.