Situation
Avid required a 33kV transformer kiosk enclosure complete with High Voltage and Low Voltage end enclosures.
Solution
Aerison was engaged as the primary contractor to deliver the engineering and design, structural, fabrication, installation, and commissioning works.
The scope included:
- Design, fabricate, assemble and supply six (6) integrated acoustic enclosure packages, to suit a caterpillar C175-16
genset and operating equipment. - Design, fabrication and supply of base frame and support structure with a weather proof acoustic enclosure, including
ventilation louvres / dampers, inlet filtration and cowls to IP56. - Installation of generator set and radiator.
- Design, fabrication, supply and installation of ancillary equipment, including 316 stainless steel muffler, double
skinned 1000L fuel tank and ventilation fans. - Design, fabrication, supply and installation of ventilation system.
- Design, fabrication, supply and installation of cooling system and fuel system.
- Fabrication, supply and installation of stainless steel 316
- Piping, pipe supports fittings and valves, with ANSI #150 class flanged connection points for external interfaces.
Project Highlights
- Bespoke engineered solution compliant with Bechtel / Chevron Safety in Design (SID) requirements.
- Modular package enclosure fully structurally certified with removable lifting lugs.
- Enclosure noise tested and certified to 85dB (A) at 1 metre.
- Enclosure designed with integrated fire detection, VESTA (Very Early Smoke Detection System) and fire suppression (Misting) system.
- Fully integrated bund and external drain points within the base frame.