Situation
The CBH Esperance Port Facility has been identified for improvement to meet forecast deficiencies in in-loading demand
capacity at the site. A study was conducted and Aerison have identified that this improvement will enable the rail grid to be used exclusively for rail freight in peak periods while maintaining road receival capacity.
Solution
Aerison was engaged as the primary contractor to deliver the
engineering and design, civil, structural, mechanical, electrical,
fabrication, installation, and commissioning works.
The scope included:
- Design of the new and extended conveyors.
- Design of upgraded elevators.
- Design of the new and modified chute work, dust extraction
and pits to service the upgrades. - Design of the associated electrical equipment.
- Design of Grid cover structure.
- Mechanical equipment design.
Outcome
The project was able to provide upgrades to in-loading conveyor and elevator systems in order to provide a net increase of 500 tonnes per hour (tph).