Client:
BHP
Sectors:
Energy
Project Delivery
Capabilities:
Engineering
Procurement & Construction (EPC)
Switch & Control Rooms
Situation
BHP requires 2 substations and an equipment room for the Powder Leach Nickel Sulphate Project which involves the development of a plant that will convert nickel metal powder into a nominal 100,000 dry tpa of high purity nickel sulphate-hexahydrate crystal product.
Solution
Aerison were engaged as the primary engineer, procurement, and construction contractor to deliver the structural, mechanical, electrical, instrumentation and commissioning works.
The scope included:
Design, supply, manufacture, inspect, test, package, and transport to site:
- One fully equipped 2 hour fire rated Nickle Sulphate 11kV Substation
- One full equipped 2 hour fire rated Nickle Sulphate 415V Substation
- One fully equipped 2 hour fire rated Nickle Sulphate DCS Equipment room