Sissingue Gold Containerised Switchrooms

AVID

Energy

Energy Sector Projects

Switch & Control Rooms

Situation

Avid required a modular containerised electrical switchroom.

Solution

Aerison was engaged as the primary contractor to deliver the engineering and design, structural, mechanical, electrical, fabrication, installation, and commissioning works.

The scope included:

  • Design, structurally engineer, manufacture, supply, and assembly of modular containerised electrical switchrooms fully lined and air conditioned.
  • Switchrooms to be constructed from custom built ISO high cube containers. 40” for the HV switchroom and 20” for the
    LV MCC.

Deflection allowance:

  • HV switch boards – ± 1mm over 1m in all directions, ± 3mm over entire length.
  • LV MCC – 5mm maximum over 3m.
  • VESDA System (Very Early Smoke Detection System) installed within the switchroom

Project Highlights

  • Engineered and certified structural design for custom built containers to meet specific deflection allowances of switchboards.
  • Switchroom designed for overseas modular transport and re-assembly onsite.

Gallery